Engineering Oklahoma’s rural infrastructure, from planning and funding through construction.
Water and wastewater systems, streets and drainage, survey and funding for communities that carry the same regulatory burden as a city with a fraction of the staff.
We are the standing engineer for 26 districts, cities and towns across the state.
26
Districts, cities and towns where we hold a standing engineering appointment
$31 million
Combined construction value of the representative projects listed here
In house
Survey crews and construction inspection, so schedules do not wait on a subconsultant
Giving life to rural Oklahoma
Conception to concrete.
Public works and private development, carried by one office from the study that justifies a project to the inspection that closes it out. We do everything in between.
Public
Municipal and rural infrastructure-
Municipal water and sewer
- Water supply, treatment and storage
- Wastewater collection and treatment
- Distribution and collection system rehabilitation
-
Streets and drainage
- Paving and roadway reconstruction
- Storm drainage and detention
- Grading and erosion control
-
System planning
- Hydraulic modelling and capacity studies
- Capital improvement plans
- Preliminary engineering reports
Private
Site development-
Civil site design
- Residential subdivisions
- Commercial sites
- Industrial sites
-
Site utilities
- Water and sanitary sewer extensions
- Lift stations and force mains
- Utility relocation for highway work
-
Entitlements
- Platting and zoning submittals
- Stormwater permits and SWPPP
- DEQ construction permits
On every project, public or private
-
Surveying and mapping
Boundary, topographic and route survey, easements and right of way exhibits, in house.
-
Funding and permitting
DEQ, OWRB, USDA Rural Development and CDBG applications, and the permits that follow.
-
Construction administration
Bidding, submittals, pay applications, inspection and the record drawings that close it out.
How a project runs
Most of our clients do not have an engineering department. This is the whole path, and we stay on it from the first step to the last.
-
1
Study
Find out what the system is actually doing, and what it will do at the population you are planning for.
-
2
Fund
Preliminary engineering report, environmental review, and the application to DEQ, OWRB, Rural Development or CDBG.
-
3
Design
Plans and specifications, permits, easements and the survey underneath all of it.
-
4
Bid
Advertise, answer the questions, issue the addenda, tabulate and recommend award.
-
5
Build
Inspection, pay applications, change orders and the record drawings that close it out.
We come to you.
Board meetings, council meetings, site walks, preconstruction conferences and bid openings. Most of the communities we work for are an hour or more from Oklahoma City, and none of this gets done from a desk.
It is also why the standing appointment matters. When a district already has an engineer, the answer to a problem starts with someone who has seen the system.
Representative work
Costs are construction value. Where a project was delivered by Aaron Mears at a previous firm, it says so.
| Project | Community | Capability | Construction value |
|---|---|---|---|
| 0.5 MGD wastewater treatment plant prior firm | Pawnee | Municipal water and wastewater | $6.7 million |
| 1.5 MGD water treatment plant rehabilitation | Town of Talihina | Municipal water and wastewater | $5.3 million |
| Water system analysis and improvements | City of Lone Grove | Hydraulic analysis and system planning | $4.3 million |
| Sewer line improvements, 6.8 miles prior firm | City of Guthrie | Municipal water and wastewater | $3.8 million |
| Water system improvements, 13.6 miles prior firm | Flint Ridge | Municipal water and wastewater | $2.1 million |
| Water system analysis and improvements prior firm | Pawnee RWD 5 | Hydraulic analysis and system planning | $1.8 million |
| Wastewater lagoon rehabilitation prior firm | Laverne | Municipal water and wastewater | $1.3 million |
| 0.25 MG storage tank prior firm | Seminole | Municipal water and wastewater | $1.2 million |
Open for bids
-
Bids open November 24, 2026 at 5:00 PM
-
City of Thomas Public Sewer Improvements - Relocation of Public Sewer Line ODOT SH 33
City of Thomas
Bids open November 24, 2026 at 5:00 PM
Tell us what the system is doing.
A consent order, a failed sanitary survey, a tank that will not hold pressure, or a funding window that closes next month. Start there and we will tell you what it takes.